PROFESSIONAL EXPERIENCE & PROJECT REFERENCES - FROM 2008 TO 2014
HELWIN ALPHA HVDC TRANSFORMER PLATFORM
(04 / 2014)
SYLWIN ALPHA HVDC TRANSFORMER PLATFORM
JACKET TOW AROUND SKAGEN
(03 / 2014)
SYLWIN ALPHA HVDC TRANSFORMER PLATFORM
(03 / 2014)
SYLWIN ALPHA HVDC TRANSFORMER PLATFORM
(03 / 2014)
SYLWIN ALPHA HVDC TRANSFORMER PLATFORM
(03 / 2014)
Marine Warranty Survey
Wismar, Germany: Vessel suitability survey of the tug "AXEL", scheduled as one of in total no. 4 tugs for the tow-out of the SYLWIN ALPHA jacket on the semi-submersible barge "EIDE BARGE 33" from Wismar port (Germany) to the offshore hand-over location where the main towing tug "UNION SOVEREIGN" is connected.
SYLWIN ALPHA HVDC TRANSFORMER PLATFORM
(03 / 2014)
Marine Warranty Survey
Wismar, Germany: Vessel suitability survey of the tug "WAL", scheduled as one of in total no. 4 tugs for the tow-out of the SYLWIN ALPHA jacket on the semi-submersible barge "EIDE BARGE 33" from Wismar port (Germany) to the offshore hand-over location where the main towing tug "UNION SOVEREIGN" is connected.
SYLWIN ALPHA HVDC TRANSFORMER PLATFORM
(03 / 2014)
Marine Warranty Survey
Wismar, Germany: Vessel suitability survey of the tug "BUGSIER 20", scheduled as one of in total no. 4 tugs for the tow-out of the SYLWIN ALPHA jacket on the semi-submersible barge "EIDE BARGE 33" from Wismar port (Germany) to the offshore hand-over location where the main towing tug "UNION SOVEREIGN" is connected.
SYLWIN ALPHA HVDC TRANSFORMER PLATFORM
(03 / 2014)
Marine Warranty Survey
Wismar, Germany: Vessel suitability survey of the tug "FAIRPLAY XII", scheduled as one of in total no. 4 tugs for the tow-out of the SYLWIN ALPHA jacket on the semi-submersible barge "EIDE BARGE 33" from Wismar port (Germany) to the offshore hand-over location where the main towing tug "UNION SOVEREIGN" is connected.
SYLWIN ALPHA HVDC TRANSFORMER PLATFORM
JACKET BUOYANCY TANK HANG-IN
(10 / 2013)
BOAT LANDING DESIGN
(10 / 2013)
Structural design of new boat landings for a 105t CTV @ Hs=2m.
BOAT LANDINGS ASSESSMENT
ACCOMMODATION VESSEL "OCEAN ATLANTIC"
(10 / 2013)
NACELLE TEMPORARY SUPPORT
(06 / 2013)
Structural design of temporary supports for nacelles during the installation operation.
HEAVY LIFT CONSULTING
WTG COMPONENT LOADOUT
(07 / 2013)
SYLWIN ALPHA HVDC TRANSFORMER PLATFORM
1.000T JACKET BUOYANCY TANKS
(2013)
HELWIN BETA HVDC TRANSFORMER PLATFORM
(2013 - 2015)
Technical consulting & engineering support for the installation of the HELWIN BETA HVDC platform project.
BORWIN BETA HVDC TRANSFORMER PLATFORM
(2013 - 2014)
Technical consulting & engineering support for the installation of the BORWIN BETA HVDC platform project.
DOLWIN GAMMA HVDC TRANSFORMER PLATFORM
(2013 - 2014)
Marine Warranty Survey - Project Manager for the DOLWIN GAMMA HVDC platform project.
4.000T & 2.500T MODULAR CABLE CAROUSELS
(2013)
Independent structural assessment (FEM analysis) and certification of the two modular cable carousels, 4.000t & 2.500t.
CO-FOUNDER & MANAGING DIRECTOR
MWS ENTERPRISE
(2013 - 2018)
Foundation of an MWS service enterprise in 2013 with two co-owners.
Managing Director / Project Manager / Engineering Lead / Warranty Surveyor.
In 2017 I decided to leave the company and to found OFFSTRUCT. In February 2018 I finally left the company and in April 2018 OFFSTRUCT was legally set up to start service.
SYLWIN ALPHA HVDC TRANSFORMER PLATFORM
(2011 - 2014)
Marine Warranty Survey - Project Manager for the SYLWIN ALPHA HVDC platform project.
HELWIN BETA HVDC TRANSFORMER PLATFORM
(2011 - 2014)
Marine Warranty Survey - Project Manager for the HELWIN BETA HVDC platform project.
GUENDALINA PLATFORM & PIPLINE
(2011)
Marine Warranty Survey - Project Manager for the GUENDALINA PLATFORM & PIPELINE project (Italy).
LONDON ARRAY OFFSHORE WINDFARM
(2010 - 2011)
Marine Warranty Survey - Project Engineer for the LONDON ARRAY offshore windfarm project.
WALNEY II OFFSHORE WINDFARM
(2010 - 2011)
Marine Warranty Survey - Project Engineer for the WALNEY II offshore windfarm project.
MEERWIND OFFSHORE WINDFARM
(2010 - 2011)
Marine Warranty Survey - Project Engineer for the MEERWIND offshore windfarm project .
BARD1 OFFSHORE WINDFARM
(2010 - 2011)
Marine Warranty Survey - Project Engineer and later Project Manager for the BARD1 offshore windfarm project.
PROJECT CARGO
OFFSHORE COMPRESSORS
(2011)
Marine Warranty Survey - Project Cargo
The Netherlands: Loadout by floating crane of two offshore compressors for the oil & gas industries for the interims transport to the port of Antwerp (Belgium). In Antwerp: loading the compressors onto a seagoing vessel for the transport to the final destination in Asia.
PROJECT CARGO
600T PIPELINE RECOVERY WINCH
(2011)
Marine Warranty Survey - Project Cargo
The Netherlands: Loadout by floating crane "ENAK" of a 600t capacity pipeline recovery winch for the interims transport to the port of Antwerp (Belgium). In Antwerp: loading the winch onto a seagoing vessel for the transport to Asia.
PROJECT CARGO
WORLD'S LARGEST LNG TANKS
(2010)
Marine Warranty Survey - Project Cargo
Czech Republic: Loadout (tandem lift) of the world's largest LNG tank (atthis time) onto a river barge, for interims transport to the port of Hamburg (Germany) on the Elbe river. In Hamburg, the tank was loaded onto a seagoing vessel for the transport to its final destination.
WELLAND OIL RIG REMOVAL
(2010)
Project Engineer
Structual assessments (FEM analyses) for the removal operations of the WELLAND OIL RIG in the North Sea and the transport to Africa.
GLOBAL TECH I OSS
(2010)
Project Engineer
Structual assessments (FEM analyses) for parts of the GLOBAL TECH I offshore substation topside (crane boom rest, heavy equipment foundations, global integrity).
GERMANISCHER LLOYD
FLEET SERVICE
STABILITY DEPARTMENT
(2008 - 2010)
Vessel stability review for all kind of vessels. Intact & damage stability assessement acc. to SOLAS. Ballast water management. EU research project "GOALDS" (ship collisions and accidents). Ship design: Helgoland combi-vessel (passengers & containers), optimized to SOLAS damage stability requirements.
OFFSTRUCT ENGINEERING | Dominik Mähl | T: +49 5193 517 35 36 | M: +49 162 74 19 179 | E: dm@offstruct.com
Hülsenbusch 23 | D-29640 Schneverdingen | Germany