PROFESSIONAL EXPERIENCE & PROJECT REFERENCES - 2015 TO 2019

TWBII OFFSHORE WINDFARM

(11 / 2019 - 07 / 2020)

Mechanical Completion II Manager

o/b OSV "WIND INNOVATION" & OSV "ISLAND DILIGENCE"

14 on / 14 off rotations, later in 2020 switched to 21 on / 21 off. Base port Eemshaven, the Netherlands. Commissioning campaign of no. 32 SENVION 6.3M152 WTG's with monopile foundations. Responsible for full technical walk downs of all turbines for the handover to the end client. I had the sad privilege to be part of the last SENVION WTG commissioning: BW07.


IFA2 INTERCONNECTOR

HVDC CABLE TRANSSPOOLING

(10 / 2019)

Marine Warranty Survey - o/b DP2 CLV "CABLE ENTERPRISE"

Southampton, UK: Transspooling of no. 2 HVDC subsea cables of each 56km from cable baskets o/b the transport vessel "IMPALA" into cable carousels o/b the DP2 CLV "CABLE ENTERPRISE".


IFA2 INTERCONNECTOR

HVDC CABLE LOADOUT

(09 / 2019)

Marine Warranty Survey

Pikkala, Finland: Loadout of no. 2 HVDC subsea cables of each 56km into cable baskets o/b the transport vessel "IMPALA".


GREATER GABBARD OFFSHORE WINDFARM

MAJOR COMPONENT EXCHANGE

(08-09 / 2019)

Marine Warranty Survey - o/b JUB "NEPTUNE"

Major Component exchange campaign. Base port Norwich, UK. The windfarm consist of no. 140 SIEMENS SWT-3.6-107 turbines with monopile foundations.


THORNTON BANK OFFSHORE WINDFARM

MAJOR COMPONENT EXCHANGE

(06 / 2019)

Marine Warranty Survey & HSE Advisor - o/b JUB "NEPTUNE"

Major Component exchange campaign. Base port Oostende, Belgium. The windfarm consist of no. 6 REPOWER 5M turbines and no. 48 SENVION 6M126 turbines with jacket foundations.


BARD1 OFFSHORE WINDFARM

(05 / 2019)

Marine Warranty Survey

Nordenham, Germany: Loadout of no. 2 spare subsea cable sections of each ~4km into a cable basket o/b the transport vessel "WESTERN ROCK".


MERKUR OFFSHORE WINDFARM

(03 / 2019)

Client Representative - o/b JUV "BLUE TERN"

Rotorblade exchange campaign. Base port Eemshaven, the Netherlands.


MERKUR OFFSHORE WINDFARM

(10 / 2018 - 02 / 2019)

Client Representative - Vessel Operation Manager - o/b OSV "VIKING NEPTUN".

14 on / 14 off rotations, base port Eemshaven, the Netherlands.

Commissioning campaign of no. 66 Haliade 150-6MW WTG's. Total capacity of the windfarm 400MW.


ARKONA OFFSHORE WINDFARM

EXTERNAL PLATFORM EXCHANGE

(09 / 2018)

Marine Warranty Survey - o/b JUB "THOR"

"PROJECT IS FINISHED"

After the collision of a vessel into one of the installed foundations of the ARKONA offshore windfarm, the damaged external platform was exchanged. Mob / demob from Mukran, Germany.


GLOBAL TECH 1 OFFSHORE WINDFARM

NACELLE LOADOUT

(08 / 2018)

Marine Warranty Survey

Bremerhaven, Germany: Roll-on loadout of two ADWEN Nacelles (M5000) onto a Barge. 


EAST ANGLIA OFFSHORE WINDFARM

PILE FOLLOWER RETRIEVAL

(08 / 2018)

Marine Warranty Survey - o/b Tug "UNION MANTA"

Retrieval of a stuck pile follower. Localization by ROV, connection of ILT and retrieval by buoyancy (ballasting) via A-Frame of the "UNION MANTA".


JUV's "WINDLIFT 1" & "THOR"

GANGWAY DOCKING STRUCTURE

(07 / 2018)

Structural Design & Analysis / Finite Element Analysis of a Gangway Docking Structure.

The docking structure is desined to be removable to avoid overhanging structures at the vessel's side during port calls or certain passages. Structural design acc. to the required technical standards and FEM assessment according to the calculated loads (incl. vessel's shell panel) for SLS and ALS. Bolted connection with MDESIGN BOLT acc. to VDI2230. Welding requirements acc. to EC3. Preparation of the complete design drawing package for fabrication. Calculation report for certification puposes.


NORSEE OST WINDFARM

ROTORBLADE EXCHANGE CAMPAIGN

(06-09 / 2018)

Marine Warranty Survey & HSE Advisor - o/b JUB "NEPTUNE"

Major component exchange campaign. Base port Bremerhaven, Germany. 14 on / 14 off rotations. The NORDSEE OST offshore windfarm  consist of no. 48 SENVION 6.2M126 turbines with jacket foundations.


LIFTING PADEYES

MARINE DIESEL GENSET

(05 / 2018)

Structural integrity assessment (FEM analysis) of the lifting padeyes of a marine diesel genset of 37t to be lifted from the deck of a jack up vessel onto a fixed offshore structure. Preparation of a fully auditable assessment report for MWS review and approval.


FOUNDATION OF OFFSTRUCT

(04 / 2018)

OFFSTRUCT was founded in April 2018 


KRIEGERS FLAK

GBS FOUNDATIONS

ONE-OFF INSTALLATION

(02 / 2018)

Marine Warranty Survey - o/b HLV / Floating Crane "RAMBIZ"

One-off installation operation of two gravity base structure foundations for twooffshore substations in the Baltic Sea. Float-off from semi-submersible barge "BOA BARGE 37", stabilization and positioning by "RAMBIZ", controlled remote-operated flooding of the GBS's chambers for ballasting down onto the seabed.


KRIEGERS FLAK

LOADOUT TRANSITION PIECES

(11 / 2017)

Marine Warranty Survey

Hoboken, Belgium: Loadout of the transition pieces for the KRIEGERS FLAK offshore substations with the floating crane "MATADOR 3" onto a barge. 


KRIEGERS FLAK

LOADOUT TRANSFORMERS

(09 / 2017)

Marine Warranty Survey

Loadout of the transformers for the KRIEGERS FLAK offshore substations with the floating crane "MATADOR 2" onto the general cargo vessel "ANDRINA F".


OFFSHORE WINDFARM NORTHSEA

W2W SUPPLY

(08 / 2017)

Marine Warranty Survey

Aberdeen, Scotland: Vessel suitability survey of the offshore support vessel "NORMAND JARSTEIN", scheduled for W2W supply services in a wind farm in the North Sea.


OFFSHORE WINDFARM NORTHSEA

(07 / 2017)

Marine Warranty Survey

France, Atlantic Coast: Vessel suitability survey of a MULTI CAT work vessel, scheduled for support services in a wind farm in the North Sea.


KRIEGERS FLAK

OFFSHORE SUBSTATIONS

(2017 - 2018)

Marine Warranty Survey - Project Manager for the KRIEGERS FLAK OSS project.


ROTORBLADE LOADOUT

(02 / 2017)

Marine Warranty Survey

Castelló, Spain: Loadout of no. 4 rotorblades of 62m length for SENVION turbines onto the hatch covers of a general cargo vessel.


KRIEGERS FLAK

OFFSHORE SUBSTATIONS

(2017)

Independent assessment of installation contractors tenders for the KRIEGERS FLAK OSS project.


BORKUM RIFFGRUND 2 OFFSHORE WINDFARM

(2017)

Marine Warranty Survey - Project Manager for the BORKUM RIFFGRUND 2 offshore windfarm project, WTG lot.


HORNS REV 3 OSS

TRANSFORMERS INSTALLATION

(06 / 2016)

Marine Warranty Survey - o/b JUV "SEA INSTALLER"

Loadout and installation of the transformers for the HORNS REV 3 offshore substation. 


ALBATROS OFFSHORE WINDFARM

(2016 - 2017)

Marine Warranty Survey - Project Manager for the ALBATROS offshore windfarm project.


HOHE SEE OFFSHORE WINDFARM

(2016 - 2017)

Marine Warranty Survey - Project Manager for the HOHE SEE offshore windfarm project.


HORNSEA ONE OFFSHORE WINDFARM

(2016 - 2017)

Marine Warranty Survey - Project Manager for the HORNSEE ONE offshore windfarm project.


GBS FOUNDATION ASSESSMENT FOR WINDFARM INSTALLATIONS

(2016)

Extensive feasibility study about the usage of gravity base structure foundations for offshore windfarms. Special focus on the recovery from seabed for temporary storage and the towage of the floating GBS's from the Medeterranean Sea to the Scottish North Sea. Cycle time assessment in conjunction with the capacities of pumping and controlled flooding. Redundancy assessment for submerged technical equipment and risk assessment.


BORKUM OFFSHORE WINDFARM OSS

MAJOR COMPONENT EXCHANGE

(2016)

Marine Warranty Survey - Project Manager for a major component exchange campaign on the BORKUM windfarm OSS.


HORNS REV 3 OSS

(2015 - 2016)

Marine Warranty Survey - Project Manager for the HORNS REV 3 OSS project.


NORDSEE ONE OFFSHORE WINDFARM

(2015 - 2016)

Marine Warranty Survey - Project Manager for the NORDSEE ONE offshore windfarm project.


MERKUR OFFSHORE WINDFARM

(2015 - 2016)

Marine Warranty Survey - Project Manager for the MERKUR offshore windfarm project.


WIKINGER OFFSHORE WINDFARM

TOWER SECTIONS LOADOUT

(11 / 2015)

Marine Warranty Survey

Avilés, Spain: Loadout of tower sections for the WIKINGER offshore windfarm onto the general cargo vessel "ARLAU" for the transport to Germany.


GLOBAL TECH 1 OFFSHORE WINDFARM

(02 / 2015)

Technical consulting for a complicated blade exchange in the GLOBAL TECH 1 offshore windfarm.


WIKINGER OFFSHORE WINDFARM

(2015)

Structural integrity assessment (FEM analysis) of tower sections for the WIKINGER offshore windfarm during the unrestricted transport on a C-type vessel from the Mediterranean Sea to the Baltic Sea. Structural design and structural analysis of modular load frames for the transport support of the above mentioned tower sections during the sea transportation. Provision of fabrication inspections of the load frames during the manufacturing phase.


POLAR STAR & POLAR LIGHTS SSFDR

LOCATION MOVE RUSSIAN WATERS
MOORING OPERATIONS

(2015)

Marine Warranty Survey - Project Manager for the location move of the two semi-submersible drilling vessels in Russian waters and corresponding mooring operations.