PROFESSIONAL EXPERIENCE & PROJECT REFERENCES - 2015 TO 2019
TWBII OFFSHORE WINDFARM
(11 / 2019 - 07 / 2020)
Mechanical Completion II Manager
o/b OSV "WIND INNOVATION" & OSV "ISLAND DILIGENCE"
14 on / 14 off rotations, later in 2020 switched to 21 on / 21 off. Base port Eemshaven, the Netherlands. Commissioning campaign of no. 32 SENVION 6.3M152 WTG's with monopile foundations. Responsible for full technical walk downs of all turbines for the handover to the end client. I had the sad privilege to be part of the last SENVION WTG commissioning: BW07.
IFA2 INTERCONNECTOR
HVDC CABLE TRANSSPOOLING
(10 / 2019)
IFA2 INTERCONNECTOR
HVDC CABLE LOADOUT
(09 / 2019)
GREATER GABBARD OFFSHORE WINDFARM
MAJOR COMPONENT EXCHANGE
(08-09 / 2019)
THORNTON BANK OFFSHORE WINDFARM
MAJOR COMPONENT EXCHANGE
(06 / 2019)
BARD1 OFFSHORE WINDFARM
(05 / 2019)
Marine Warranty Survey
Nordenham, Germany: Loadout of no. 2 spare subsea cable sections of each ~4km into a cable basket o/b the transport vessel "WESTERN ROCK".
MERKUR OFFSHORE WINDFARM
(03 / 2019)
MERKUR OFFSHORE WINDFARM
(10 / 2018 - 02 / 2019)
ARKONA OFFSHORE WINDFARM
EXTERNAL PLATFORM EXCHANGE
(09 / 2018)
GLOBAL TECH 1 OFFSHORE WINDFARM
NACELLE LOADOUT
(08 / 2018)
EAST ANGLIA OFFSHORE WINDFARM
PILE FOLLOWER RETRIEVAL
(08 / 2018)
JUV's "WINDLIFT 1" & "THOR"
GANGWAY DOCKING STRUCTURE
(07 / 2018)
Structural Design & Analysis / Finite Element Analysis of a Gangway Docking Structure.
The docking structure is desined to be removable to avoid overhanging structures at the vessel's side during port calls or certain passages. Structural design acc. to the required technical standards and FEM assessment according to the calculated loads (incl. vessel's shell panel) for SLS and ALS. Bolted connection with MDESIGN BOLT acc. to VDI2230. Welding requirements acc. to EC3. Preparation of the complete design drawing package for fabrication. Calculation report for certification puposes.
NORSEE OST WINDFARM
ROTORBLADE EXCHANGE CAMPAIGN
(06-09 / 2018)
LIFTING PADEYES
MARINE DIESEL GENSET
(05 / 2018)
FOUNDATION OF OFFSTRUCT
(04 / 2018)
OFFSTRUCT was founded in April 2018
KRIEGERS FLAK
GBS FOUNDATIONS
ONE-OFF INSTALLATION
(02 / 2018)
Marine Warranty Survey - o/b HLV / Floating Crane "RAMBIZ"
One-off installation operation of two gravity base structure foundations for twooffshore substations in the Baltic Sea. Float-off from semi-submersible barge "BOA BARGE 37", stabilization and positioning by "RAMBIZ", controlled remote-operated flooding of the GBS's chambers for ballasting down onto the seabed.
KRIEGERS FLAK
LOADOUT TRANSITION PIECES
(11 / 2017)
KRIEGERS FLAK
LOADOUT TRANSFORMERS
(09 / 2017)
OFFSHORE WINDFARM NORTHSEA
W2W SUPPLY
(08 / 2017)
OFFSHORE WINDFARM NORTHSEA
(07 / 2017)
KRIEGERS FLAK
OFFSHORE SUBSTATIONS
(2017 - 2018)
Marine Warranty Survey - Project Manager for the KRIEGERS FLAK OSS project.
ROTORBLADE LOADOUT
(02 / 2017)
KRIEGERS FLAK
OFFSHORE SUBSTATIONS
(2017)
Independent assessment of installation contractors tenders for the KRIEGERS FLAK OSS project.
BORKUM RIFFGRUND 2 OFFSHORE WINDFARM
(2017)
Marine Warranty Survey - Project Manager for the BORKUM RIFFGRUND 2 offshore windfarm project, WTG lot.
HORNS REV 3 OSS
TRANSFORMERS INSTALLATION
(06 / 2016)
ALBATROS OFFSHORE WINDFARM
(2016 - 2017)
Marine Warranty Survey - Project Manager for the ALBATROS offshore windfarm project.
HOHE SEE OFFSHORE WINDFARM
(2016 - 2017)
Marine Warranty Survey - Project Manager for the HOHE SEE offshore windfarm project.
HORNSEA ONE OFFSHORE WINDFARM
(2016 - 2017)
Marine Warranty Survey - Project Manager for the HORNSEE ONE offshore windfarm project.
GBS FOUNDATION ASSESSMENT FOR WINDFARM INSTALLATIONS
(2016)
Extensive feasibility study about the usage of gravity base structure foundations for offshore windfarms. Special focus on the recovery from seabed for temporary storage and the towage of the floating GBS's from the Medeterranean Sea to the Scottish North Sea. Cycle time assessment in conjunction with the capacities of pumping and controlled flooding. Redundancy assessment for submerged technical equipment and risk assessment.
BORKUM OFFSHORE WINDFARM OSS
MAJOR COMPONENT EXCHANGE
(2016)
Marine Warranty Survey - Project Manager for a major component exchange campaign on the BORKUM windfarm OSS.
HORNS REV 3 OSS
(2015 - 2016)
Marine Warranty Survey - Project Manager for the HORNS REV 3 OSS project.
NORDSEE ONE OFFSHORE WINDFARM
(2015 - 2016)
Marine Warranty Survey - Project Manager for the NORDSEE ONE offshore windfarm project.
MERKUR OFFSHORE WINDFARM
(2015 - 2016)
Marine Warranty Survey - Project Manager for the MERKUR offshore windfarm project.
WIKINGER OFFSHORE WINDFARM
TOWER SECTIONS LOADOUT
(11 / 2015)
GLOBAL TECH 1 OFFSHORE WINDFARM
(02 / 2015)
Technical consulting for a complicated blade exchange in the GLOBAL TECH 1 offshore windfarm.
WIKINGER OFFSHORE WINDFARM
(2015)
Structural integrity assessment (FEM analysis) of tower sections for the WIKINGER offshore windfarm during the unrestricted transport on a C-type vessel from the Mediterranean Sea to the Baltic Sea. Structural design and structural analysis of modular load frames for the transport support of the above mentioned tower sections during the sea transportation. Provision of fabrication inspections of the load frames during the manufacturing phase.
POLAR STAR & POLAR LIGHTS SSFDR
LOCATION MOVE RUSSIAN WATERS
MOORING OPERATIONS
(2015)
Marine Warranty Survey - Project Manager for the location move of the two semi-submersible drilling vessels in Russian waters and corresponding mooring operations.
OFFSTRUCT ENGINEERING | Dominik Mähl | T: +49 5193 517 35 36 | M: +49 162 74 19 179 | E: dm@offstruct.com
Hülsenbusch 23 | D-29640 Schneverdingen | Germany