PROFESSIONAL EXPERIENCE & PROJECT REFERENCES - 2020 TO 2024
ENERGY PORT BREMERHAVEN
(09-11 / 2024)
Extensive technical and logistical feasibility study with regards to the usage of the ENERGY PORT Bremerhaven as a base port for the offshore wind industry. Provision of accompanying engineering tasks: scaling of potential future 30MW WTG components, distributed loads, crane capacities and radii, SPMT capacities & configurations, transport & installation vessels, cycle times, etc. Full 3D CAD visualization of marine units, components & port logistics: storage, load-in, load-out.
https://www.bremenports.de/presse/bremen-plant-einen-energyport-ein-projekt-von-nationaler-bedeutung
https://www.butenunbinnen.de/nachrichten/energy-port-bremerhaven-104.html
BARD1 OFFSHORE WINDFARM
(07-11 / 2024)
BASE LOAD POWER HUB
BATTERY ENERGY STORAGE SYSTEM
(07 / 2024)
NOIRMOUTIER OFFSHORE WINDFARM
(06 / 2024)
PROJECT CARGO
TRANSPORTATION OF OFFSHORE STRUCTURES
(06 / 2024)
BALTIC EAGLE OFFSHORE WINDFARM
(05 / 2024)
OFFSHORE WINDFARM NORTHSEA
W2W SUPPLY
(02 / 2024)
SUEDLINK INFRASTRUCTURE PROJECT
TRANSPORTATION OF CABLE DRUMS
(01 / 2024)
BARD1 OFFSHORE WINDFARM
(01-04 / 2024)
Extensive engineering and 3D CAD support for diverse operational aspects of the OSV "EDDA BREEZE": W2W backup system integration (SMST), deck layout assessment, full geometrical 3D CAD analysis (clearances, working height, collision analysis with surrounding structures, etc.). Assessement of crane operability with regards to the backup W2W system. Diverse supportive engineering tasks. Update of scenario booklets for backup W2W system covering all involved marine units, sector analyses for vessel aproach, etc.
DOLWIN 5 EXPORT CABLE PROJECT
(10 / 2023)
DOLWIN 5 EXPORT CABLE PROJECT
(10 / 2023)
DOLWIN 5 EXPORT CABLE PROJECT
(09 / 2023)
P&I CLUB - NORTHSTANDARD
RISK ENTRY SURVEY
(09 / 2023)
BALTIC EAGLE OFFSHORE WINDFARM
(08 / 2023)
BARD1 OFFSHORE WINDFARM
(07-12 / 2023)
Extensive engineering and 3D CAD support: Preparation of 3D models of JUV "THOR" & OSV "EDDA BREEZE" for operational assessment purposes. Collision analyses, vessel approch analyses (safety zones, exclusion zones, clearances, W2W system limits), emergency response (medic transfer), preparation of operational storyboards.
DOLWIN 5 EXPORT CABLE PROJECT
(07 / 2023)
CROSS ATLANTIC TOWAGE OF DRY DOCK
(07 / 2023)
SCARBOROUGH GAS PIPELINE
WESTERN AUSTRALIA
(07 / 2023)
BALTIC EAGLE OFFSHORE WINDFARM
(06 / 2023)
NORTH SEA WINDFARM
(05 / 2023)
BORWIN 5 CABLE PROJECT
(05 / 2023)
BORWIN 5 CABLE PROJECT
(05 / 2023)
DOLWIN 5 EXPORT CABLE PROJECT
(05 / 2023)
DOLWIN 5 EXPORT CABLE PROJECT
(05 / 2023)
BALTIC EAGLE OFFSHORE WINDFARM
(04-05 / 2023)
Marine Warranty Survey
Rostock, Germany: Installation of pile plugs at monopiles, SAT (pressure tests) of pile plugs, lifted loadout (dual lift) & wet tow of monopiles to installation site for the receipt by the Hheavy lift vessel "SWANEN". Monopile diameter up to 9m, weight up to 1.401t and length up to 89.4m. For the loadout the world's strongest crawler crane at this time, a brand new Liebherr LTR-13000 was in charge, besides an LTR-1800-1.0 as a second crane for the tandem lift. This was the first official job for the LTR-13000 and though this first loadout operation was an event for the local press for witness.
BALTIC EAGLE OFFSHORE WINDFARM
(04 / 2023)
Marine Warranty Survey
Mukran, Germany: Barge suitability survey of the split hopper barge "B1002", scheduled for the collection of drilling soil for disposal in the event of pile refusal during piling on the BALTIC EAGLE offshore windfarm project.
BALTIC EAGLE OFFSHORE WINDFARM
(04 / 2023)
Marine Warranty Survey
Mukran, Germany: Barge suitability survey of the barge "P3", scheduled for the transport of a pile driving hammer on the BALTIC EAGLE offshore windfarm project.
BAKU FLAG POLE
WORLD'S TALLEST FLAG POLE INSTALLATION
(03 / 2023 - 01 / 2024)
Heavy Lifting Engineering
Provision of extensive heavy lifting consulting for the installation of the world's tallest flag pole in Baku, Azerbeijan. The pole has a total height of 192m and consists of nine sections weighing up to 236t each. The flag was ratified by Guiness on 06.11.2024 as the largest and heaviest ever flown (>500kg, 72m x 36m, 2.592m²).
BALTIC EAGLE OFFSHORE WINDFARM
(03 / 2023)
Marine Warranty Survey
Rostock, Germany: Vessel suitability survey of the seagoing tug "AMBER II", scheduled for the wet towage of monopiles from Rostock to the BALTIC EAGLE offshore windfarm installation site.
BALTIC EAGLE OFFSHORE WINDFARM
(03 / 2023)
Marine Warranty Survey
Mukran, Germany: Vessel suitability survey of the supply vessel "BALTIC EXPLORER", scheduled for the deployment and recovery of sound monitoring eqipment in the BALTIC EAGLE offshore windfarm.
SCARBOROUGH GAS PIPELINE
WESTERN AUSTRALIA
(02 / 2023)
CALVADOS OFFSHORE WINDFARM
(01-02 / 2023)
SAINT NAZAIRE EXPORT CABLE
REPAIR CAMPAIGN 2022
(02-06 / 2022)
Project Manager - Owners Engineer
Duties: primary person of contact for the client, attendance of all relevant meetings, leading the on-site client representatives & daily conference call, project planning & progress monitoring, preparation of control plans and follow-up with client representatives on site, review of MoM by contractors and subcontractors, control of commitments and client requirements, coordination and review of all relevant procedures / risk assessments / studies / reports provided by contractors, provision of recommendations / evaluations to the client, risk mitigation measures, support to ensure operational efficiency, project reporting.
JUV "WINDLIFT 1"
WALKWAY BRIDGING CONNECTION
(07 / 2021)
Structural Design & Analysis / Finite Element Analysis of a Walkway Bridging Connection o/b the JUV "WINDLIFT 1".
Site measurement o/b the "WINDLIFT 1", 3D design of the walkway acc. to the required technical standards and FEM assessment according to the calculated loads. Preparation of the complete design drawing package for fabrication.
THAI CLEAN FUEL PROJECT
SIEMENS GENERATORS & EQUIPMENT
(04 / 2021)
BALTIC PIPE PROJECT
(04 / 2021)
RIFFGAT OFFSHORE WINDFARM
GEARBOX EXCHANGE
(03 / 2021)
THAI CLEAN FUEL PROJECT
SIEMENS GAS TURBINES
(03 / 2021)
SAINT NAZAIRE EXPORT CABLE
REPAIR CAMPAIGN 2021
(03-08 / 2021)
Project Manager - Owners Engineer
Duties: Primary person of contact for the client, attendance of all relevant meetings, leading the on-site client representatives & daily conference, project planning & progress monitoring, preparation of control plans and follow-up with client representatives on site, review of MoM by contractors and subcontractors, control of commitments and client requirements, coordination and review of all relevant procedures / risk assessments / studies / reports provided by contractors, provision of recommendations / evaluations to the client, risk mitigation measures, support to ensure operational efficiency, project reporting.
P&I CLUB - THE STANDARD CLUB
RISK ENTRY SURVEY
(02 / 2021)
HELWIN ALPHA HELI DECK REPLACEMENT
(02 / 2021)
Technical Document Review & Feasibility Assessment
Review of the technical documentation for the heli deck replacement operation on the HELWIN ALPHA HVDC transformer platform with the JUV "MPI RESOLUTION" and with regards to marine operations & heavy lifting.
OFFSTRUCT ENGINEERING | Dominik Mähl | T: +49 5193 517 35 36 | M: +49 162 74 19 179 | E: dm@offstruct.com
Hülsenbusch 23 | D-29640 Schneverdingen | Germany